2 MW installation
2 MW installation
An important work in the field of distribution boards.
As part of an important contract, Manieri Automazioni took care of the construction of a medium voltage substation and the commissioning of the system.
The work, designed and studied with great attention, was carried out by our technicians specialized in the sector.
The plant thus reached a total power of 2 Megawatts.